Marque Oil & Gas

Net Zero Development

Step-by-step progression of the local gas development and carbon capture integration.

Barrow Processing

Gas piped to Barrow for processing at existing facility (dashed red line and red triangle).

Domestic Supply

10% of gas piped back to the IoM for domestic supplies through existing pipeline network and Irish interconnector spur (solid red line).

Connah’s Quay Generation

90% of gas piped to Connah’s Quay for electricity generation and CO2 emissions capture as part of the CCS scheme.

Carbon Storage

Captured CO2 emissions compressed and piped (purple line) to the Hamilton & Lennox Carbon Store for underground storage in depleted gas production reservoir.

Clean Interconnector

Emissions-free electricity supplies the Isle of Man through a new interconnector (black dashed line).

Detailed map showing the proposed pipeline network to Barrow and Connahs Quay