Step-by-step progression of the local gas development and carbon capture integration.
Barrow Processing
Gas piped to Barrow for processing at existing facility (dashed red line and red triangle).
Domestic Supply
10% of gas piped back to the IoM for domestic supplies through existing pipeline network and Irish interconnector spur (solid red line).
Connah’s Quay Generation
90% of gas piped to Connah’s Quay for electricity generation and CO2 emissions capture as part of the CCS scheme.
Carbon Storage
Captured CO2 emissions compressed and piped (purple line) to the Hamilton & Lennox Carbon Store for underground storage in depleted gas production reservoir.
Clean Interconnector
Emissions-free electricity supplies the Isle of Man through a new interconnector (black dashed line).